This project has some challenges about circulation;
1) the private connections of the elevator between the apt 1, 6 and 7
2) there is public and private areas of the site
3) and the vertical circulation should not in front of the city view
The construction of building prepared to have a flexibility to locate the functions according to owner wants.
Design challenges are solved with this flexibility.
And also:
The garage has natural ventilation
Created a sliding/folding sunshade for the west elevation
You can check the graphics to see our design process
Thank you for your competition
Best wishes